×
App Icon
The Standard e-Paper
Join Thousands of Readers
★★★★ - on Play Store
Download Now

Ruto: State to build Sh100 billion fixed bridge in Mombasa County

Likoni residents walk on the Likoni floating bridge to Mombasa Island. [Omondi Onyango,Standard]

Mombasa residents will no longer use the Likoni floating bridge that was built at the peak of Covid-19 pandemic at Liwatoni in 2021.

The 82-metre metallic bridge was hurriedly built across the Kilindini shipping channel, near the Likoni ferry crossing, by the China Raod and Bridge Corporation for Sh1.9 billion to curb congestion in ferries during the Covid period.

Get Full Access for Ksh299/Week
Unlock the Full Story — Join Thousands of Informed Kenyans Today
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in