The auctioneer attaches some of the construction machinery belonging to CMC Di Ravenna at a yard in Molo Forest, Nakuru County on April 22, 2021. The property was attached to recover a Sh20.6 million debt by the contractor to a local company. [Kennedy Gachuhi, Standard].
Hope among Nakuru residents to have sufficient water for domestic use from the Sh34 billion Itare dam in Kuresoi South continues to fade by the day.