×
App Icon
The Standard e-Paper
Home To Bold Columnists
★★★★ - on Play Store
Download Now

Two CSs face probe over stalled Sh28b Itare dam

A section of Itare Dam in Kuresoi North.The Construction of the Sh 38 billion dam stopped after contractor filed for bankruptcy.:Kipsang Joseph/Standard

At least two Cabinet Secretaries are among dozens of top officials to be questioned by investigators starting this week over the Sh28.9 billion stalled Itare dam.

Director of Public Prosecutions (DPP) Noordin Haji and Directorate of Criminal Investigations (DCI) George Kinoti have been to Dubai to gather more evidence on the dam saga and in the trail of Sh734 million that was frozen and was about to be moved from Dubai to Somalia.

Get Full Access for Ksh299/Week
Unlock the Full Story — Join Thousands of Informed Kenyans Today
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in