Plans to phase out thermal power have received a major boost after the government approved the construction of Olkaria VII Geothermal Power, which will pump an extra 80.3 megawatts (MW) into the national grid.
The multi-billion-shilling project is a collaboration between the governments of Kenya and Japan and the European Investment Bank, with a projected completion by 2027.