×
App Icon
The Standard e-Paper
Kenya’s Boldest Voice
★★★★ - on Play Store
Download App

Sh1.7b Likoni floating bridge takes shape

Construction under way for the proposed Likoni floating bridge. [Omondi Onyango, Standard]

Works on the first floating footbridge across the Likoni Ferry channel have started.

The Sh1.7 billion bridge contracted to the China Road and Bridge Corporation is being erected at Liwatoni on the island side and is a composite structure designed for pedestrians only.

Get Full Access for Ksh299/Week.
Fact‑first reporting that puts you at the heart of the newsroom. Subscribe for full access.
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in