A contractor works on the Moi South Lake road in Naivasha [Antony Gitonga, Standard]
KenGen is laying the ground for its much-hyped industrial park at the Olkaria geothermal field.
The power producer plans to construct a link road to the freight terminal of the Standard Gauge Railway (SGR) at Suswa.