×
App Icon
The Standard e-Paper
Truth Without Fear
★★★★ - on Play Store
Download Now

Sh67 million mango processing plant commissioned in Tana River

Tana River-based mango pulp manufacturer, Galole Fruit Processing Factory, is back in operation after years of being dormant. 

The factory, which has been revived at a cost about Sh67 million, will now diversify its operations, incorporating a Sh5.4 million bottled water processing plant with the capacity to produce 4,500 bottles of water per hour.

Get Full Access for Ksh299/Week
Unlock the Full Story — Join Thousands of Informed Kenyans Today
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in