×
App Icon
The Standard e-Paper
Home To Bold Columnists
★★★★ - on Play Store
Download Now

Lake Turkana Wind Power receives first turbine shipment

The first shipment of turbines for the 310 megawatt Lake Turkana Wind Power project (LTWP) has arrived at the Port of Mombasa.

The firm's General Manager Phylip Leferink announced that the turbines were the first of 365 that will be transported by road approximately 1,200 km to the wind firm site located at Sarima village, Loiyangalani Division of Marsabit County.

Get Full Access for Ksh299/Week
Unlock the Full Story — Join Thousands of Informed Kenyans Today
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in