Plans to construct a recycling plant at the Dandora dumpsite have been put on hold to allow a feasibility study to be conducted.
Kenya Electricity Generating Company (KenGen) yesterday announced that it had contracted an independent consultant to conduct the study to determine the practicality and sustainability of setting up a plant at the county’s official dumpsite.