Kenya Railways moots plan for Sh8b Riruta-Ngong commuter railway

Business
By Macharia Kamau | Jul 25, 2024
Kenya Railways workers undertake repair works at Kiganjo Railway Station on July 3, 2020. [Mose Sammy, Standard]

Kenya Railways Corporation (KRC) is considering constructing a new metre gauge railway line to serve Ngong town in the government's bid to decongest Ngong Road.

The railway line, which is expected to cost Sh8.2 billion, will start at Riruta where it will branch off the Nairobi-Kikuyu line and cut through Dagoretti South and Lang'ata sub-counties in Nairobi, proceeding to Kajiado North Sub-county in Kajiado County and terminate in Ngong town.

It will have four stations in Lenana, Karen, Bulbul, and Ngong. It will also entail the construction of a three-kilometre bridge from Southern Bypass to Karen Shopping Centre.

"The proposed Riruta-Ngong Metre Gauge Railway (MGR) Commuter Project is envisaged to cost approximately Sh8.2 billion. The works are estimated to be completed within a construction period of 12 months with a 12-month defect liability period during which the contractor is expected to maintain the system and carry out repair works which may occur to the satisfaction of the proponent and supervision project engineers," said Kenya Railways in an Environmental and Social Impact Assessment (Esia) submitted to Nema as it sought approvals for the project.

KRC said the project aims at addressing transportation challenges experienced by commuters from Ngong to Nairobi's Central Business District (CBD).

Ngong Road is characterised by heavy traffic jams owing to a high number of vehicles, particularly during peak hours.

Recent upgrades of the transport infrastructure, including the dualling of the segment between Dagoretti Corner and Karen as well as the construction of the Nairobi Southern Bypass, have not been adequate to handle the traffic growth.

Ngong town is one of Nairobi's satellite towns and tends to have a high number of people commuting to and from the towns for work and other errands every day.

The Nairobi Metropolitan Authority has in the past made a conservative estimate that Sh100 billion is lost to traffic jams annually in Nairobi and a good chunk of this could be lost on Ngong Road.

Share this story
How African volunteers are helping shape AI through Wikipedia
Volunteers in Africa are helping train the world’s artificial intelligence (AI) systems by contributing human-curated content to Wikipedia, the world’s largest online encyclopedia.
KTDA appoints Francis Miano acting CEO
KTDA appoints Eng Francis Miano as acting Chief Executive Officer effective January 16, replacing Wilson Muthaura, who proceeds on terminal leave.
Trump tariff threat casts long shadow over Kenya-Iran trade
Countries conducting business with the Islamic Republic risk being slapped with a 25 per cent tariff.
World Bank unlocks Sh5.5b green fund for local SMEs
The funds are available to entrepreneurs in electric mobility and transport, energy-efficient and green buildings, sustainable agriculture, and waste management solutions.
How KQ's fortunes sank
At the heart of Captain Mabura's “Phoenix Plan” is diversifying revenue streams by transforming KQ from a basic airline to an aviation industrial hub through partnerships with US industry giants.
.
RECOMMENDED NEWS