Closed road near Athi River to be opened Friday
Eastern
By
Sammy Wambua
| Mar 16, 2018
Chinese contractors building the Athi River- Machakos turn off dual carriage way section of Nairobi- Mombasa filled in a gap that developed between one frontal edge of Stoni Athi bridge.
The swollen river rose over the bridge washing away the soil gambion that connected it with the road.
Athi River PCS Peter Kimweli told Standard Digital that the road would be passable by Friday morning once the chasm was filled up with boulders and instant-binding concrete.
Hundreds of motorists were stranded on either side of the bridge after police closed the road.
Contrary to earlier reports, the bridge was intact but for the erosional gap between it and the road.
READ MORE
VAT reforms: Why manufacturers want tax cuts
Inside Nyakang'o's trouble with Infrastructure Fund Bill
BAT Kenya posts Sh7.7b full-year profit
Kenya launches roadmap to reduce building sector emissions
Aviation workers vow strike despite restraint by court
APA Insurance unveils cyber insurance cover to strengthen business resilience
Green housing: New roadmap targets 50pc cut in Kenya power bills
Sh22b tax claim at the centre of Tullow's Turkana oil sale deal
African lenders bank on new infrastructure facility to bypass external funding
At the nearby Greenpark estate, home owners were still counting losses after the river washed away a perimeter wall, flooding some houses.