Closed road near Athi River to be opened Friday
Eastern
By
Sammy Wambua
| Mar 16, 2018
Chinese contractors building the Athi River- Machakos turn off dual carriage way section of Nairobi- Mombasa filled in a gap that developed between one frontal edge of Stoni Athi bridge.
The swollen river rose over the bridge washing away the soil gambion that connected it with the road.
Athi River PCS Peter Kimweli told Standard Digital that the road would be passable by Friday morning once the chasm was filled up with boulders and instant-binding concrete.
Hundreds of motorists were stranded on either side of the bridge after police closed the road.
Contrary to earlier reports, the bridge was intact but for the erosional gap between it and the road.
READ MORE
Sh22b tax claim at the centre of Tullow's Turkana oil sale deal
Why KPA is in the spot over plan to outsource port services
Affordable housing: What Kenya can learn from American model
Why surveyors oppose nomination of National Land Commission members
Why tougher capital rules are reshaping Kenya's insurance industry
AI platform to fast-track women, youth into Kenya's green jobs
New Sh400 million mall targets Nairobi's Eastlands retail boom
Travellers to complete airport transactions via mobile money
How UAE's Sh130 billion AI initiative could transform African economies
How a grieving Busia couple turned agony into profitable venture
At the nearby Greenpark estate, home owners were still counting losses after the river washed away a perimeter wall, flooding some houses.