Traffic headache stalks Nairobi-Nakuru highway motorists
Counties
By
Josphat Thiong’o
| Jul 08, 2018
Motorists using the Nairobi-Nakuru Highway should brace themselves for disruption of traffic on Monday.
Kenya National Highways Authority (KeNHA) announced on Sunday that it would be diverting traffic along that section of the road to allow for construction to take place.
“This is to facilitate the construction of works of the rehabilitation and capacity enhancement of James Gichuru road junction-Rironi highway currently being undertaken along the project road,” read an advert in the dailies.
The 1.2 kilometre length of diversion will start at Kamandura (Kwa Rahab) which is about 1.6 km from Chunga Mali Interchange Bridge.
Nakuru Bound traffic is expected to use the newly constructed Diversion (Old Naivasha road), Nairobi bound traffic will be re-routed through the existing slip road, while Mai Mahiu traffic will use the newly constructed diversion.
READ MORE
Co-op Bank posts Sh29.75b profit, proposes a record Sh14.67 billion dividend
MPs push KenGen to upgrade its power generation technology
Mwangi's Sh734m windfall as Equity posts record earnings
MoUs without jobs? Kenya's seafarer strategy under scrutiny
Why World Bank has banned PwC Kenya for 21 months
Property sector reaps big from rising demand for luxury healthcare
Cost-cutting measures when building a house
Africa will need 150,000 construction managers by 2035, says report
Nairobi floods: What can be done to remedy the situation
Womesa gets new team to push for women's interests in maritime sector
Limuru traffic will also be re-routed through the slip road.
KeNHA has urged motorists to obey traffic signs, installed signals and traffic flaggers as well as maintain low speeds along the section.