The 2024 Paris Summer Olympics and Paralympics cost the French state just under 6 billion euros ($6.9 billion), the national audit body announced in an "initial estimate" on Monday.
The organisation of the two sporting extravaganzas last summer cost 2.77 billion euros, which included 1.4 billion euros for security.
A further 3.19 billion euros was spent on work linked to infrastructure projects.
READ MORE
How low production is slowing down jobs in the wholesale and retail sector
US now opens door for Kenya to reclaim vital Agoa trade benefits
Bold policy implementation needed to jumpstart Kenya's auto industry
Drought, soaring food prices pushing millions into hunger
Why you can pay dearly for giving wrong facts about your cover
Kenya's mining sector faces litmus test on social welfare as investors get jittery
AG, Treasury CS Mbadi to be grilled by MPs over Safaricom sale
Energy CS pushes Parliament for support on Turkana oil project
Joho faces backlash over Sh8 trillion Mrima Hill rare earth mining project
The Olympics ran from July 26 to August 11, while the Paralympics took place from August 28 to September 8, with organisers making the most of historic sites in central Paris, either as venues or the backdrop to the events.
The Games were widely hailed as highly successful.
The national audit body said there would be a "heightened interest" in the figures because France is also preparing to host the 2030 Winter Olympics in the French Alps.
It is the first time actual figures have been announced, although the president of the national audit body, Pierre Moscovici, had in 2024 said they would cost the state "three, maybe four, five billion euros".
Moscovici, a former French finance minister and European Union Commissioner, added that the real costs would only be known at the end of the Games.
Until now, only the costs of the local organising committee (COJO) of 4.4 billion euros, which represented a surplus of 76 million euros, have been made public.
That figure came almost exclusively from private financing and from Solideo, the body responsible for delivering Olympic construction projects, which was in part publicly financed.
A more detailed report will be published in October as other costs are not yet known.
The body added that because of a lack of concrete information, the figures did not include "the positive and negative impact the Games had on economic activity".
It said, however, that the Games were "indisputably a success with the public and the media".
Another report on the legacy of the Games will be published in 2026.