Kenya Railways to operate express trains on SGR
Business
By
Macharia Kamau
| Jan 20, 2017
Kenya Railways (KR) has defended the quality of trains that will be operated on the Standard Gauge Railway (SGR).
The firm has also announced it will operate express trains to be known as intercity trains between Nairobi and Mombasa, with the journey between the two cities expected to take four hours.
The trains will make only one stop at Mtito Andei to allow for the crossing of another train in the opposite direction. KR Managing Director Atanas Maina said yesterday the firm will also operate county trains, which will make seven stops along the railway route, with each stop lasting a maximum of five minutes.
He said the county trains are expected to take five hours and 25 minutes between Nairobi and Mombasa. The passenger trains, added Mr Maina, will be given priority over cargo trains.
“The railway will operate freight and passenger services. Passenger trains will be given priority on the line. Freight trains will be stopped at the crossing stations to enable passenger trains to pass in the same or opposite direction. This is a common practice all over the World,” he said.
READ MORE
Forget miraa: Discovery of minerals stirs up Meru locals
How to turn the tide against Kenyans' poor saving culture
Super-rich investors bet on Kenya amid economic gloom
Unlocking the creative power of out-of-home advertising
It's a bumpy ride for e-mobility firms in bid to move past start-up phase
Deepening connections with customers through conversational messaging
Bid to boost Africa's talent pool with tech scholarships in top gear
Kenyan retailers ready to pounce as Ethiopia to open up market
Hiring civil servants on contract will fuel corruption, experts say
Experts and Kenyans at large have questioned whether the country got value for money in the locomotives deal with China, with some arguing that they are outdated and unlikely to hit top speeds, thus negating their acquisition.
But Maina said contrary to speculation, the locomotives are state-of-the-art engines and will attain high speeds on track and substantially reduce travel time between Nairobi and Mombasa.
He noted that while the locomotives can achieve a speed of 120 kilometres per hour, the intercity trains will travel at a speed of 100 kilometres while the county trains will travel at 85 kilometres per hour.
This will mean that the 457-kilometre journey between Mombasa West and Nairobi South passenger stations will take the intercity trains four and a half hours while the county trains will take about five hours and 25 minutes.
“The average speed takes care of slow running on heavy gradients and braking from and accelerating to sectional speeds. The county passenger train, therefore, has a lower average speed due to the more frequent stops at designated passenger stations,” said Mr Maina.
He said the railway line has seven designated stops - Mariakani, Miasenyi, Voi, Mtito Andei, Kibwezi, Emali and Athi River.
“All the other 26 stations are passing stations where passenger train will not stop,” said Maina.
The new line is expected to be completed and become operational in the coming months, with a test ride between Mombasa and Nairobi set for June.
- Forget miraa: Discovery of minerals stirs up Meru locals
- Super-rich investors bet on Kenya amid economic gloom
- Hiring civil servants on contract will fuel corruption, experts say
- Kenyan retailers ready to pounce as Ethiopia to open up market
- KQ suspends flights to Kinshasa over detention of staff