Rural Electrification Authority to set up solar power plant in Wajir
News
By
Mumbi Kinyua
| Jun 16, 2016
The Rural Electrification Authority (REA) is planning to establish a 60KW (KiloWatt) solar power plant in Wajir.
In a public notice published in the dailies Wednesday, the Rural Electrification Authority (REA) said it will on July 5 send an application to the Energy Regulatory Commission for a permit to that would see it set up a solar hybrid power plant in the north-eastern county.
REA was quick to assure locals that the project would not have adverse effects on them.
“The grant of the permit will not have any adverse effect on any public or local authorities, companies, persons or bodies of persons within the area of the undertaking,” read the notice which was signed by REA CEO Ng’ang’a Munyu.
READ MORE
Vodafone to take control of UK operator
Germany firm BioNTech to cut up to 1,860 jobs as Covid jab sales drop
Ruto allocates more funds to sectors likely to win him votes in 2027
Revealed: Consumption outpacing recycling of waste
Packaged Githeri? The rise of ready-to-eat meals
Firm bets on financial inclusion to unlock boda boda sector growth
Leave Nganyas alone: They define Kenyan culture and creativity
Absa unveils Sh100bn asset finance plan
A gridlock over compensation for land has seen a number of projects stall. Recently, contractors of the Kinangop Wind Project in Kinangop, Nyandarua, were forced to pull the plug on the project after a stalemate on how the locals would be compensated for their land.
Anyone who may be disgruntled over the project have 30 days to lodge a complaint to the energy regulator.